LOCATION:
The Colonia Esmerelda Water Supply project is located in El Salvador, the smallest country in Central America.
The community is in the southeastern region of the country’s capitol San Salvador along the hillside of the San Jacinto neighborhood.
COMMUNITY DETAILS:
The community consists of approximately 85 households and 430 total residents.
All residents are native Salvadorans and most commonly work as housekeepers, tailors, or markets and shops workers/owners. The community has a Board of 10 members who regularly meet to discuss and develop resolutions to any ongoing community issues.
Because of the forced nature of the community’s relocation during El Salvador’s civil war, the community’s infrastructure was never properly developed, including their water source. Since residents could not afford a drilled well, they hand-dug a well for 70 families. This well was only 15 meters deep and was susceptible to contamination. Following a 7.6 earthquake in 2001 the output from the well decreased, nor could the community dig it any deeper due to a large boulder at the bottom of the well. The well’s decreasing output led to periods of water rationing in the community and periods where community members had to purchase drinking water.
Additionally, Colonia Esmeralda sits on top of a hill and experiences severe erosion during the rainy season. This erosion damaged the community’s main road and wore away the foundation beneath their well pump. A taxi, car, and truck had all fallen downhill when driving on the road. Other roads and passageways between the upper and lower parts of town also became dangerous for pedestrians.
The Rotary Clubs of Humble Intercontinental and San Salvador Sur assisted with project funding and establishing local technical expertise, contractors and equipment suppliers.
PROJECT SUMMARY:
The community had three ongoing challenges that allowed for EWB-CHPC involvement. These projects included the improvement to tank and distribution piping for clean water supply, construction of a retaining wall for road travel and the design of a community drainage system to reduce flooding and protect resident’s homes.
To help address the water sourcing and distribution issue, the chapter worked with the Rotarians and a local drilling contractor (Pozos y Bombas) to drill an 80-meter deep well in December of 2006.
To address erosion issues, the chapter constructed a 32-meter long concrete masonry wall varying from three to five meters in heigh, with construction completed in April of 2007.
The project team implemented improvements to water storage and distribution for a community of ~430 people and erosion control efforts.


Left-to-right: Mitigation of erosion within the neighborhood.


Left-to-right: Steps carved directly into hill with tires were replaced with concrete stairway.
PROJECT ADOPTION DATE:
June 2005 (Central Houston Professional Chapter and South Houston Professional Chapter)
PROJECT STATUS:
Complete
TEAM LEAD:
- Ariadna Ruiz – Project Lead
Past Leads
- Marcos Flores
- Isilda Kamosso